WV 214 over COAL RIVER

0.01 MI NORTH OF CR 13/1 · County 039, West Virginia · Built 1987 · 2 Lanes · 1,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000020A289
Year Built
1987
Length
91.8 m (301.2 ft)
Max Span
36.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.