I-77 SBL over CR 12

6.38 M NORTH OF US 33 · County 035, West Virginia · Built 1966 · 2 Lanes · 7,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000018A169
Year Built
1966
Length
51.6 m (169.3 ft)
Max Span
14.9 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
7,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$766,000
Total Project Cost
$766,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.