Harrison Co 35 over Right Fork

0.02 miles W of Harr 35/5 · County 033, West Virginia · Built 2018 · 1 Lanes · 300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00000000017A357
Year Built
2018
Length
9.4 m (30.8 ft)
Max Span
8.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.