INTERSTATE 79 NB over WV ROUTE 20

2.41 MI SOUTH WV RT 58 F · County 033, West Virginia · Built 1973 · 2 Lanes · 13,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000017A251
Year Built
1973
Length
58.5 m (191.9 ft)
Max Span
25.9 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
13,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$731,000
Total Project Cost
$1,157,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.