WV 29 F over SPERRY RUN

0.07 MI S OF CR 23/9 SLS · County 031, West Virginia · Built 1950 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000016A055
Year Built
1950
Reconstructed
2005
Length
8.3 m (27.2 ft)
Max Span
6.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.