COUNTY ROUTE 9 over SPRING CREEK

0.92 Miles E. of CR 219/2 · County 025, West Virginia · Built 1997 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000013A218
Year Built
1997
Length
49.7 m (163.1 ft)
Max Span
18 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.