WV 42 T over ROBINSON RUN

0.25 MI S OF CR 07 SLS · County 023, West Virginia · Built 1961 · 2 Lanes · 5,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000012A039
Year Built
1961
Length
37.4 m (122.7 ft)
Max Span
14.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
5,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000
Total Project Cost
$625,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.