COUNTY ROUTE 20 over TANNER CREEK

0.01 MI E OF CO 7 · County 021, West Virginia · Built 1944 · 2 Lanes · 750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000011A050
Year Built
1944
Length
24.2 m (79.4 ft)
Max Span
21.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
750
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.