I-77 over ROUTE 15 AND PAINT CREEK

2.31 MI S MAHAN I/C · County 019, West Virginia · Built 1981 · 4 Lanes · 27,220 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000010A222
Year Built
1981
Length
144.2 m (473.1 ft)
Max Span
25.6 m
Width
27.6 m (90.6 ft)
Lanes
4
Daily Traffic
27,220
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.