COUNTY ROUTE 2 over BULL PUSH CREEK

0.03 Miles N. of CR 2/3 · County 019, West Virginia · Built 1976 · 2 Lanes · 4,323 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
00000000010A005
Year Built
1976
Length
9.6 m (31.5 ft)
Max Span
9.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
4,323
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$451,000
Total Project Cost
$740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.