COUNTY ROUTE 3 over ANNAMORIAH RUN

0.71 MILE SOUTH OF CR 3/3 · County 013, West Virginia · Built 2000 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000007A066
Year Built
2000
Length
15.9 m (52.2 ft)
Max Span
14.6 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$800,000
Total Project Cost
$875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.