CR 35 over FOURPOLE CREEK

0.12 MI. S. OF CR.48 · County 011, West Virginia · Built 1979 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000006A086
Year Built
1979
Length
14.9 m (48.9 ft)
Max Span
13.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$112,000
Total Project Cost
$243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.