CR 29 over FUDGES CREEK

0.04 MI SOUTH OF CR 34 · County 011, West Virginia · Built 1929 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000006A071
Year Built
1929
Length
10.4 m (34.1 ft)
Max Span
10.1 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$95,000
Total Project Cost
$150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.