WV 2 over GUYANDOTTE RIVER

0.10 MI WEST OF US 60 · County 011, West Virginia · Built 1976 · 2 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000006A012
Year Built
1976
Length
178.4 m (585.3 ft)
Max Span
53 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
7,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$790,000
Total Project Cost
$825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.