County Route 30 over Buffalo Creek

0.12 mi. West jct WV67 · County 009, West Virginia · Built 1978 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000005A034
Year Built
1978
Length
47.2 m (154.9 ft)
Max Span
18.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$93,000
Total Project Cost
$93,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.