I-79 NBL over I-79

0.58 MI N OF CO 5/11 · County 007, West Virginia · Built 1973 · 2 Lanes · 9,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000004A131
Year Built
1973
Length
116.8 m (383.2 ft)
Max Span
26.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
9,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.