I-79 NBL over Co. 21

3.33 MI S US 19 · County 007, West Virginia · Built 1971 · 2 Lanes · 5,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000004A109
Year Built
1971
Length
48.1 m (157.8 ft)
Max Span
16.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
5,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.