COUNTY ROUTE 12 over LAUREL CREEK

0.61 MILE SOUTH OF CR 5 · County 005, West Virginia · Built 1988 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000003A057
Year Built
1988
Length
15.5 m (50.9 ft)
Max Span
7.4 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.