I-81 NB over Potomac River

On WV/MD State Line · County 003, West Virginia · Built 1965 · 3 Lanes · 61,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000002A157
Year Built
1965
Reconstructed
2020
Length
360.9 m (1184.1 ft)
Max Span
57.9 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
61,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,490,000
Total Project Cost
$2,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.