JBLM ACCESS CORRID over E. LINCOLN/PERIMETER RD

BARNES BLDV · County 053, Washington · Built 2015 · 2 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPFORLEW000018
Year Built
2015
Length
111.9 m (367.1 ft)
Max Span
55.9 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
18,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.