SPILLWAY BRIDGE over SPILLWAY CHANNEL

LITTLE GOOSE DAM · County 013, Washington · Built 1968 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPNPWWA0LGOSPY
Year Built
1968
Length
153.6 m (503.9 ft)
Max Span
16.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$122,000
Total Project Cost
$183,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.