HOKO-OZETTE ROAD over COAL CREEK
21 MI. SW OF JCT. STATE R · County 009, Washington · Built 1970 · 1 Lanes · 75 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.154222, -124.66875
This bridge is in worse condition than 54.9% of bridges in County 009. The average bridge in Washington is 0 years old; this one is 56 years old.
Bridge Details
- Structure #
- 9500035P0000000
- Year Built
- 1970
- Reconstructed
- 2002
- Length
- 18.9 m (62 ft)
- Max Span
- 9.4 m
- Width
- 6.7 m (22 ft)
- Lanes
- 1
- Daily Traffic
- 75
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $70,000
- Total Project Cost
- $115,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.