SOL DUC VALLEY ROA over NORTH FORK SOL DUC RIVER

5.5 MI. SE OF JCT. HWY. 1 · County 009, Washington · Built 1959 · 2 Lanes · 496 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
9500006P0000000
Year Built
1959
Length
29 m (95.1 ft)
Max Span
18.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
496
Material
Concrete Continuous
Design
Tee Beam
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$130,000
Total Project Cost
$195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.