CHUTE ACCESS over ESQUATZEL DIVERS CHANNEL
NR PASCO WA · County 021, Washington · Built 1958 · 1 Lanes · 5 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
46.358378, -119.251164
This bridge is in worse condition than 18% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 68 years old.
Nearby Bridges
COUNTY ROAD over ESQUATZEL CANAL
Built 1952
COUNTY ROAD over PASCO PUMP LATERAL
Built 1954
COUNTY ROAD over PASCO PUMP LATERAL
Built 1967
COUNTY ROAD over POTHOLES EAST CANAL
Built 1953
COUNTY HIGHWAY over ESQUATZEL CANAL
Built 2019
COUNTY ROAD over ESQUATZEL DIVERSION CANA
Built 1964
COUNTY ROAD over POTHOLES EAST CANAL
Built 1955
SR 224 over OVERFLOW
Built 1993
SR 224 over YAKIMA RIVER
Built 1993
CNTY RD 100 over I-182
Built 1983
Bridge Details
- Structure #
- 11PECL056
- Year Built
- 1958
- Length
- 6.7 m (22 ft)
- Max Span
- 6.4 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Concrete
- Design
- Slab
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.