FARM ACCESS over Potholes East Canal Late

17mi. N. of Richland WA · County 021, Washington · Built 1955 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
11PECL0109
Year Built
1955
Reconstructed
2009
Length
8.8 m (28.9 ft)
Max Span
8.1 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
10
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Reclamation
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.