MI 2.8 THOMPSON over ROCKY COULEE WASTEWAY
NR MOSES LAKE WA · County 025, Washington · Built 1950 · 1 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.181, -119.2018
This bridge is in worse condition than 97% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 76 years old.
Nearby Bridges
6 ROAD NE over EAST LOW CANAL BLK 41
Built 1989
STA 19+00 ACCESS over ROCKY COULEE DIVERSION
Built 1948
8 ROAD NE over EAST LOW CANAL BLK 40
Built 1989
L ROAD NE over ROCKY COULEE WW BLK 41
Built 1983
MAINTENANCE ROAD over ROCKY COULEE WASTEWAY
Built 1949
Nuss Farm Road over EAST LOW CANAL EL 20 LAT
Built 1957
RIDGEVIEW RD over WASTEWAY
Built 1994
P RD NE over ROCKY COULEE
Built 1974
K NE over ROCKY COULEE WW
Built 1984
7 ROAD NE over CRAB CREEK
Built 1952
Bridge Details
- Structure #
- 11ELC0013
- Year Built
- 1950
- Length
- 24.6 m (80.7 ft)
- Max Span
- 24.4 m
- Width
- 3.8 m (12.5 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.