LIBERTY ROAD over SWAUK CREEK

0.03 E HWY 97 · County 037, Washington · Built 2024 · 2 Lanes · 291 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

This bridge is in worse condition than 9.9% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 2 years old.

Bridge Details

Structure #
089534000000000
Year Built
2024
Length
20.7 m (67.9 ft)
Max Span
20.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
291
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,408,000
Total Project Cost
$2,816,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.