Lakemont Blvd. SE over Coal Creek
.6 S FOREST DRIVE SE · County 033, Washington · Built 2024 · 2 Lanes · 28,015 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 2 years old.
Bridge Details
- Structure #
- 089516000000000
- Year Built
- 2024
- Length
- 14.5 m (47.6 ft)
- Max Span
- 13 m
- Width
- 14.7 m (48.2 ft)
- Lanes
- 2
- Daily Traffic
- 28,015
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,038,000
- Total Project Cost
- $2,076,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.