COOKE CANYON ROAD over HILINE CANAL

0.24 N BRICKMILL RD · County 037, Washington · Built 2024 · 2 Lanes · 235 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089504000000000
Year Built
2024
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
235
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,137,000
Total Project Cost
$2,274,000