NF TEANAWAY RD over NF TEANAWAY RIVER

02.85 NF TEANAWAY RD · County 037, Washington · Built 2023 · 2 Lanes · 135 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089403000000000
Year Built
2023
Length
40.8 m (133.9 ft)
Max Span
38.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
135
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,599,000
Total Project Cost
$5,198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.