6TH STREET over PATAHA CRK

.10 S US12 · County 023, Washington · Built 2022 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089372000000000
Year Built
2022
Length
15.2 m (49.9 ft)
Max Span
14.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$404,000
Total Project Cost
$808,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.