Latigo Street over Spurgeon Creek
0.15 m S of 89th Ave SE · County 067, Washington · Built 2022 · 2 Lanes · 40 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.956314, -122.812297
This bridge is in worse condition than 5.5% of bridges in County 067. The average bridge in Washington is 0 years old; this one is 4 years old.
Nearby Bridges
RICH ROAD over SPURGEON CREEK
Built 2012
RICH ROAD over DESCHUTES RIVER
Built 1981
YELM HWY S.E. over RAILROAD
Built 1951
WALDRICK ROAD over DESCHUTES RIVER
Built 1986
WALDRICK ROAD over RAILROAD
Built 1995
Mullen Road over CREEK
Built 1999
HENDERSON BLVD over DESCHUTES RIVER
Built 1961
HOLMES ISD RD over LONG LAKE
Built 1962
SR 121 over BLOOMS DITCH
Built 2016
PENINSULA DRIVE over ST.CLAIR LAKE
Built 1963
Bridge Details
- Structure #
- 089323000000000
- Year Built
- 2022
- Length
- 17.4 m (57.1 ft)
- Max Span
- 16.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,210,000
- Total Project Cost
- $2,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.