North Shore Road over Great Bend Creek

13.3 M JCT SR 300 · County 045, Washington · Built 2022 · 2 Lanes · 513 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
089304000000000
Year Built
2022
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
513
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$614,000
Total Project Cost
$1,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.