19TH ST over CHUCKANUT CREEK

0.1 S JCT RAINIER AVE · County 073, Washington · Built 2021 · 1 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

48.700678, -122.493811

This bridge is in worse condition than 6.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
089255000000000
Year Built
2021
Length
12.2 m (40 ft)
Max Span
10.7 m
Width
3.1 m (10.2 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$618,000
Total Project Cost
$1,235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.