Upper Hoh Road over Canyon Creek

10.2 E JCT SR 101 · County 031, Washington · Built 2021 · 2 Lanes · 877 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089248000000000
Year Built
2021
Length
36.6 m (120.1 ft)
Max Span
35.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
877
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,346,000
Total Project Cost
$4,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.