S 228th STREET over UPRR
0.3 MI W OF SR-167 · County 033, Washington · Built 2021 · 4 Lanes · 2,200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.397611, -122.242472
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 5 years old.
Nearby Bridges
S 228TH STREET over BNSF RR
Built 2009
SR 167 over 4TH AVE N
Built 1967
SR 167 over 4TH AVE N
Built 1967
SR 167 over NP RY
Built 1967
SR 167 over NP RY
Built 1967
SR 167 over RAILROAD & PED TRAIL
Built 1967
SR 167 over CMSTPP RR
Built 1967
SR 167 OFF RAMP NB over SPRINGBROOK CREEK
Built 1986
SR 167 over 84TH AVE SOUTH
Built 1967
SR 167 over 84TH AVE SOUTH
Built 1967
Bridge Details
- Structure #
- 089218000000000
- Year Built
- 2021
- Length
- 67.4 m (221.1 ft)
- Max Span
- 34.4 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 2,200
- Material
- Concrete Continuous
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,803,000
- Total Project Cost
- $13,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.