SPOKANE STREET over MILL CREEK

0.5 MI SE OF MAIN STREET · County 071, Washington · Built 2020 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

46.068361, -118.335611

This bridge is in worse condition than 7.2% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
089196000000000
Year Built
2020
Length
19.2 m (63 ft)
Max Span
18.6 m
Width
20.8 m (68.2 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,318,000
Total Project Cost
$2,635,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.