HANNEGAN RD over TEN MILE CREEK

0.2 N TEN MILE ROAD · County 073, Washington · Built 2018 · 2 Lanes · 11,198 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089011000000000
Year Built
2018
Length
19.5 m (64 ft)
Max Span
18.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
11,198
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,336,000
Total Project Cost
$2,671,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.