Sullivan Lake Rd over Harvey Creek

9 miles NE Hwy 31 (Ione) · County 051, Washington · Built 2018 · 2 Lanes · 450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089005000000000
Year Built
2018
Length
30.5 m (100.1 ft)
Max Span
29.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
450
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.