OLD OLYMPIC HWY over MCDONALD CREEK

4.0 NE JCT SR101 · County 009, Washington · Built 2018 · 2 Lanes · 7,837 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
088989000000000
Year Built
2018
Length
43.9 m (144 ft)
Max Span
42.7 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
7,837
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,780,000
Total Project Cost
$5,559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.