CRYSTAL MNT BLVD over SILVER CREEK
5.85 E JCT 410 · County 053, Washington · Built 2016 · 2 Lanes · 675 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
45.942608, -121.473319
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 10 years old.
Nearby Bridges
STRONG ROAD over WHITE SALMON RIVER
Built 1987
SUNNYSIDE ROAD over WHITE SALMON RIVER
Built 1972
RIVER ROAD over WHITE SALMON RIVER
Built 1981
OLD CREAMERY RD over TROUT CREEK
Built 1997
SR 141 over CAVE CREEK
Built 1947
SUNNYSIDE ROAD over WHITE SALMON RIVER
Built 1972
Jennings Road over Bear Creek
Built 2001
MT. ADAMS HWY. over TROUT CREEK
Built 1956
MARTIN ROAD over WHITE SALMON RIVER
Built 2003
Mt. Adams Rd. over WHITE SALMON RIVER
Built 1958
Bridge Details
- Structure #
- 088949000000000
- Year Built
- 2016
- Length
- 8.8 m (28.9 ft)
- Max Span
- 8.8 m
- Width
- 18.9 m (62 ft)
- Lanes
- 2
- Daily Traffic
- 675
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $593,000
- Total Project Cost
- $1,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.