NE Etna Road over Cedar Creek

1.0 E Cedar Creek Rd · County 011, Washington · Built 2017 · 2 Lanes · 335 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
088940000000000
Year Built
2017
Length
39.3 m (128.9 ft)
Max Span
38.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
335
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$919,000
Total Project Cost
$1,838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.