MAIN STREET over FISHTRAP CREEK

0.2 W THIRD STREET · County 073, Washington · Built 2014 · 2 Lanes · 6,039 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
088697000000000
Year Built
2014
Length
29.3 m (96.1 ft)
Max Span
28 m
Width
17.2 m (56.4 ft)
Lanes
2
Daily Traffic
6,039
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,914,000
Total Project Cost
$3,827,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.