LITTLEROCK ROAD over SALMON CREEK

3.0 NW JCT SR 121 · County 067, Washington · Built 2014 · 2 Lanes · 6,458 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
088678000000000
Year Built
2014
Length
23.5 m (77.1 ft)
Max Span
21.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
6,458
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$786,000
Total Project Cost
$1,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.