MOUNTAIN LOOP HWY over MARTEN CREEK

20.6 E JCT SR 92 · County 061, Washington · Built 2011 · 2 Lanes · 1,574 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088390000000000
Year Built
2011
Length
41.1 m (134.8 ft)
Max Span
39.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,574
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,614,000
Total Project Cost
$5,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.