OIL CITY ROAD over FOSSIL CREEK
9.75 SW JCT SR101 · County 031, Washington · Built 2005 · 1 Lanes · 30 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.749711, -124.405019
This bridge is in worse condition than 1% of bridges in County 031. The average bridge in Washington is 0 years old; this one is 21 years old.
Nearby Bridges
US 101 over BRADEN CREEK
Built 1931
US 101 over CEDAR CR
Built 1931
US 101 over NOLAN CREEK
Built 2004
OIL CITY ROAD over ANDERSON CREEK
Built 1974
US 101 over STEAMBOAT CREEK
Built 2021
OIL CITY ROAD over CASSEL CREEK
Built 2000
US 101 over LOST CREEK
Built 1999
US 101 over HOH RIVER
Built 1931
UPPER HOH ROAD over HELL ROARING CREEK
Built 1981
DOWANS CREEK RD over DOWANS CREEK
Built 1974
Bridge Details
- Structure #
- 088152000000000
- Year Built
- 2005
- Length
- 19.5 m (64 ft)
- Max Span
- 18.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $914,000
- Total Project Cost
- $1,828,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.