COAL CREEK PKWY over MAY CREEK

0.25 MI N OF SE 95TH WAY · County 033, Washington · Built 2009 · 4 Lanes · 32,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

47.518111, -122.159111

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 17 years old.

Nearby Bridges

Bridge Details

Structure #
088025000000000
Year Built
2009
Length
88.4 m (290 ft)
Max Span
33.5 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
32,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,202,000
Total Project Cost
$8,403,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.