Valley Mall BLVD. over Wide Hollow Creek

.39 W of S 3rd · County 077, Washington · Built 2009 · 4 Lanes · 8,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
087997000000000
Year Built
2009
Length
27.4 m (89.9 ft)
Max Span
26.5 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,945,000
Total Project Cost
$5,890,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.