310TH AVE SE over PATTERSON CREEK

0.8 MI N OF SR-202 · County 033, Washington · Built 2008 · 2 Lanes · 338 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
087795000000000
Year Built
2008
Length
11.3 m (37.1 ft)
Max Span
10 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
338
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$848,000
Total Project Cost
$1,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.