LOOMIS TRAIL RD over DAKOTA CR
00.3 E SUNRISE ROAD · County 073, Washington · Built 2006 · 2 Lanes · 604 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.949806, -122.591661
This bridge is in worse condition than 11.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 20 years old.
Nearby Bridges
SUNRISE RD over DAKOTA CR
Built 2005
SUNRISE RD over S FORK DAKOTA CR
Built 2005
DELTA LINE RD over DAKOTA CR
Built 1950
LOOMIS TRAIL RD over SOUTH FORK DAKOTA CR
Built 1950
DELTA LINE RD over DAKOTA CR
Built 1965
STEIN RD over DAKOTA CR TRIB
Built 1906
STEIN RD over DAKOTA CREEK
Built 2000
CUSTER SCHOOL RD over DAKOTA CR
Built 1950
CUSTER SCHOOL RD over DAKOTA CR TRIB
Built 1954
BIRCH BAY LYNDEN over BERTRAND CR
Built 1949
Bridge Details
- Structure #
- 087598000000000
- Year Built
- 2006
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 604
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.